{"id":2873,"date":"2025-12-30T13:49:26","date_gmt":"2025-12-30T11:49:26","guid":{"rendered":"https:\/\/erbrail.com\/?p=2873"},"modified":"2025-12-30T14:16:59","modified_gmt":"2025-12-30T12:16:59","slug":"rail-baltica-pamattrases-dienvidu-posma-buvniecibai-nodoti-nakamie-19-kilometri","status":"publish","type":"post","link":"https:\/\/erbrail.com\/lv\/rail-baltica-pamattrases-dienvidu-posma-buvniecibai-nodoti-nakamie-19-kilometri\/","title":{"rendered":"&#8220;Rail Baltica&#8221; pamattrases dienvidu posm\u0101 b\u016bvniec\u012bbai nodoti n\u0101kamie 19 kilometri"},"content":{"rendered":"\n<p><strong>Rail Baltica projekta ievies\u0113js Latvij\u0101 \u2013 uz\u0146\u0113mums Eiropas Dzelzce\u013ca l\u012bnijas un Rail Baltica pamattrases b\u016bvnieks ERB Rail parakst\u012bju\u0161i aktu par b\u016bvdarbu uzs\u0101k\u0161anu n\u0101kamaj\u0101s trij\u0101s b\u016bvat\u013cauj\u0101s jeb 19,62 kilometros, un ar\u012b \u0161aj\u0101 posm\u0101 var\u0113s s\u0101kt pamattrases b\u016bvniec\u012bbas darbus.<\/strong><\/p>\n\n\n\n<p>Trij\u0101s b\u016bvat\u013cauj\u0101s s\u0101kotn\u0113ji norisin\u0101sies pamatdarbi, t\u0101di k\u0101 teritorijas atme\u017eo\u0161ana, celmu iz\u0146em\u0161ana un nespr\u0101gu\u0161\u0101s mun\u012bcijas sken\u0113\u0161ana. Tiks b\u016bv\u0113ts ar\u012b dzelzce\u013ca uzb\u0113rums un saist\u012btie piek\u013cuves un uztur\u0113\u0161anas ce\u013ci, caurtekas un \u016bdens novadgr\u0101vji.<\/p>\n\n\n\n<p>Rail Baltica pamattrases dienvidu posm\u0101 (45 km) Misa\u2013Lietuvas robe\u017ea ir kopum\u0101 11 b\u016bvat\u013caujas jeb vienpadsmit maz\u0101ki un liel\u0101ki b\u016bvlaukumi. Darbi \u0161obr\u012bd aktiviz\u0113ti septi\u0146\u0101s b\u016bvat\u013cauj\u0101s, kopum\u0101 vair\u0101k nek\u0101 30 km, kur norisin\u0101sies pamatdarbi un b\u016bv\u0113s dzelzce\u013ca uzb\u0113rumu.<\/p>\n\n\n\n<p>Kop\u0161 \u0161\u012b gada s\u0101kuma b\u016bvniec\u012bbas sagatavo\u0161an\u0101s darbi pamattrases dienvidu posm\u0101 norisin\u0101j\u0101s pirmaj\u0101s \u010detr\u0101s b\u016bvat\u013cauj\u0101s 11 km garum\u0101. No kopum\u0101 atme\u017eo\u0161anai nepiecie\u0161amajiem 250 ha, atme\u017eoti ~ 116 ha topo\u0161\u0101s dzelzce\u013ca trases zonas un patlaban atme\u017eo\u0161anas proces\u0101 atrodas v\u0113l ~84 ha. Nespr\u0101gu\u0161\u0101s mun\u012bcijas sken\u0113\u0161ana pabeigta turpat visu pirmo \u010detru b\u016bvat\u013cauju teritorij\u0101 un l\u012bdz 2025. gada decembrim atrasti un neitraliz\u0113ti 100 spr\u0101dzienb\u012bstami priek\u0161meti. Savuk\u0101rt topo\u0161\u0101 Rail Baltica Infrastrukt\u016bras apkopes centra 16.5 ha teritorij\u0101 pie Iecavas uzs\u0101kta un pabeigta B\u016bvniec\u012bbas koordin\u0101cijas b\u0101zes izveide. T\u0101s teritorij\u0101 veikta dzelzce\u013ca uzb\u0113ruma un gr\u0101vju dren\u0101\u017eas izb\u016bve, izveidoti pievedceli, kopum\u0101 no\u0146emta augsnes virsk\u0101rta ~ 90 t\u016bkst. m\u00b3 apjom\u0101, veikti ~21 t\u016bkst. m\u00b3 grunts izrakumi un uzb\u0113ruma izb\u016bve ~100 t\u016bkst. m\u00b3 apjom\u0101.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rail Baltica projekta ievies\u0113js Latvij\u0101 \u2013 uz\u0146\u0113mums Eiropas Dzelzce\u013ca l\u012bnijas un Rail Baltica pamattrases b\u016bvnieks ERB Rail parakst\u012bju\u0161i aktu par [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2875,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_editorskit_title_hidden":false,"_editorskit_reading_time":0,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","footnotes":""},"categories":[14],"tags":[227,226,31],"acf":[],"_links":{"self":[{"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/posts\/2873"}],"collection":[{"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/comments?post=2873"}],"version-history":[{"count":5,"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/posts\/2873\/revisions"}],"predecessor-version":[{"id":2882,"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/posts\/2873\/revisions\/2882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/media\/2875"}],"wp:attachment":[{"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/media?parent=2873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/categories?post=2873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/erbrail.com\/lv\/wp-json\/wp\/v2\/tags?post=2873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}